Attendence:
Ethan, Tucker, Kevin, Penelope, Nick, Jared
Agenda;
1) Overview of changes
2) Harvest parts from betabot
3) Design bucket cont.
4) Rewire*
5) Add panels to field
6) Work on mounting Hardware*
-Ethan dedrickson
Harvested a motor hub from beta bot to test with lift system gears the hub from the beta bot didnt fit but the other hub we had found did so problem solved. -nick
PENELOPE helped Kevin fix the robot.
Jared drilled and screwed the new arena wall panels together. I also glued PVC parts of the panels together.
Kevin: I disassembled the end of the manipulator, realined the gears, found mounting locations for the NXT and motor controler, and remounted the manipulator motor.
Tuesday, December 2, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment